Fortnum & Mason

Invicta Analytical Services
Value: £20,000
Project Duration – 4 weeks

We are proud to have provided our asbestos removal services to the prestigious Fortnum & Mason department store in London. When working for retail clients, as with many other sectors, providing minimal mess and disruption to their business is always our main priority. Our professional and courteous team worked through the night to remove asbestos insulation boards, floor tiles and other asbestos based products enabling the store to remain fully operational during its normal opening hours.

Newington House

Assured Safety Management
Value: £26,250
Project Duration – 3 weeks

Newington House is a privately owned estate that required textured coated ceilings to be removed from a detached property within the grounds, followed by a full  environmental clean. Our onsite supervisor liaised closely with the tenant to ensure all works were carried out at a convenient time. The client was so impressed with our communication and service that he provided us with an emphatic testimonial.

Private Residential

Manor House
Kettlebrook Construction
Value: £70,000
Project Duration – 10 weeks

Our highly skilled team carried out various works at this domestic manor house including asbestos pipe lagging and thermal insulation to pipework, removal of asbestos and concrete panels from various parts of the property, a full environmental clean and other specialist services. Working in an inhabited and listed property, our focus was to work with extreme care to cause minimal disruption and to avoid any damage.

Chelmsford College

Excel Group
Value: £20625.00
Project Duration – 12 weeks

This project was carried out in a large college whilst the college was fully operational. The works included removal of all AIB ceilings from various parts of the college, working over weekends and evenings to ensure it was removed and handled without disrupting staff and students. There were also a number of asbestos roof sheets being removed from external buildings prior to demolition and these where removed in a safe working environment.

Gateway House

Formation Design And Build
Value: £44385.00
Project Duration – 2 weeks

Works to a former Office Block for a leading Design Company. Works to the boiler basement room to remove thermal insulation in the flue ducting

The removal of floor tiles to four floors of the Building